{"id":172,"date":"2019-01-29T13:18:12","date_gmt":"2019-01-29T13:18:12","guid":{"rendered":"https:\/\/okinawakobori.com\/en\/?page_id=172"},"modified":"2019-01-29T13:18:12","modified_gmt":"2019-01-29T13:18:12","slug":"solarpower","status":"publish","type":"page","link":"https:\/\/okinawakobori.com\/en\/business\/solarpower","title":{"rendered":"Solar power"},"content":{"rendered":"<div class=\"inner\">\n<ul class=\"resnav sol\">\n<li class=\"select\">About Solar Panels<\/li>\n<li>Solar power construction results<\/li>\n<\/ul>\n<div class=\"solen\">\n<div class=\"content_wrap\">\n<h3 class=\"solttl\">Solar power<\/h3>\n<h4>Solar Cell Manufacturers We Represent<\/h4>\n<p class=\"pb40\">Kaneka, Toshiba, JCU<\/p>\n<h4>About Solar Panels<\/h4>\n<p class=\"pb40\">Fossil fuels account for 80% or more of the total energy consumed in Japan. It\u2019s been suggested that if we continue to use the oil on earth as we now do, it will be depleted in another 40 years. In addition, we must also consider the impact of greenhouse gases. To actively tackle this issue, our company devotes its efforts to promoting the spread of solar and wind power generation systems, aiming to be a company that creates earth-friendly energy.<\/p>\n<h5>There is a wide diversity of types of solar cell modules. <br \/>We promote the use of amorphous solar cells, which are optimum for the climate of Okinawa.<\/h5>\n<h6>1. Classification of solar cells by materials<\/h6>\n<p class=\"pb20\">Types of solar cells by materials<\/p>\n<div class=\"img\">\n<img decoding=\"async\" src=\"\/images\/business\/sfig1.jpg\" alt=\"\">\n<\/div>\n<p><!-- img --><\/p>\n<h6>2. We recommend amorphous<\/h6>\n<p>Amorphous solar cells benefit from the following characteristics.<\/p>\n<dl>\n<dt>1. Outstanding temperature performance<\/dt>\n<dd>One drawback of crystalline solar cells is their sensitivity to high temperatures, meaning that their power generation capacity is reduced as summer temperatures rise. Amorphous solar cells have excellent temperature performance\u2014in fact, their power generation capacity tends to increase as temperatures rise.<\/dd>\n<dt>2. Minimally impacted by shade, with outstanding power generation efficiency<\/dt>\n<dd>Compared to crystalline solar cells, amorphous solar cells are minimally impacted by shade and demonstrate outstanding power generation efficiency across the entire system. Because they are minimally impacted by shade, they are even suitable for low-angle installation.<\/dd>\n<dt>3. Low-angle (5\u00b0) flat installation is possible.<\/dt>\n<dd>Low-angle (5\u00b0) flat installation enables high-density installation even on rooftop corners. When installed in this way, the module surface blocks the direct rays of the sun and prevents them from entering the building\u2019s interior, which also contributes to reduced air-conditioning costs.<\/dd>\n<\/dl>\n<h6>3. The benefits of adopting amorphous solar cells<\/h6>\n<p>Impact of shade is minimal<\/p>\n<p>*Outstanding power generation efficiency across the entire system.<\/p>\n<p>*Low-angle (5\u00b0) flat installation is possible.<\/p>\n<p class=\"pb30\">Due to their configuration, amorphous solar cells tend to be less impacted by shade. (References below)<\/p>\n<div class=\"img img2\">\n<img decoding=\"async\" src=\"\/images\/business\/sfig2.jpg\" alt=\"\">\n<\/div>\n<p><!-- img -->\n<\/div>\n<div class=\"content_wrap disnon\">\n<h3 class=\"solttl\">Installation Results<br class=\"sp\"> (Solar power system)<\/h3>\n<div class=\"list\">\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg1.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Okinawa Electric Power Company, Inc.<\/dd>\n<dt>Job<\/dt>\n<dd>Miyakojima Mega Solar Experimental Study Facility [4MW] (Using Kaneka 320kW)<\/dd>\n<dt>Installation<\/dt>\n<dd>September, 2010<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg2.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Higashi Village<\/dd>\n<dt>Job<\/dt>\n<dd>General Agricultural Food Processing Center Solar Power System Installation [23.1kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>February, 2010<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg3.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Naha City<\/dd>\n<dt>Job<\/dt>\n<dd>Kokura Kindergarten Solar Power System [5kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>March, 2010<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg4.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Okinawa Electric Power Company, Inc.<\/dd>\n<dt>Job<\/dt>\n<dd>Nago City Mega Solar System [1MW] (Using Kaneka 500kW)<\/dd>\n<dt>Installation<\/dt>\n<dd>March, 2012<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg5.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Haebaru Town Arakawa Community Center<\/dd>\n<dt>Job<\/dt>\n<dd>Arakawa Community Center Solar Power System [10kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>May, 2006<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg6.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Aeon Town Co., Ltd.<\/dd>\n<dt>Job<\/dt>\n<dd>Installation at Aeon Town Nanjo Osato [10kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>December, 2010<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg7.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Ie Village<\/dd>\n<dt>Job<\/dt>\n<dd>Installation at Higashi Kindergarten (Solar panels )[10kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>February, 2012<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg8.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Iheya Village<\/dd>\n<dt>Job<\/dt>\n<dd>Iheya Elementary School Solar Power System [10kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>March, 2005<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg9.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Ie Village Agricultural Food Processing Center<\/dd>\n<dt>Job<\/dt>\n<dd>Installation at Iejima Local Product Storage Building (Electrical equipment installation) [23.1kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>March, 2013<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg10.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>University of the Ryukyus<\/dd>\n<dt>Job<\/dt>\n<dd>Solar Power System Installation at University of the Ryukyus (Senbaru) Library [80kW]<\/dd>\n<dt>Installation<\/dt>\n<dd>January, 2010<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg11.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. H (10.58kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Uruma City<\/dd>\n<dt>Installation<\/dt>\n<dd>April, 2013<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg12.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. Y (5.06kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Motobu Town<\/dd>\n<dt>Installation<\/dt>\n<dd>May, 2012<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg13.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. S (4.14kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Hirara, Miyakojima City<\/dd>\n<dt>Installation<\/dt>\n<dd>November, 2011<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg14.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. M (4.14kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Hirara, Miyakojima City<\/dd>\n<dt>Installation<\/dt>\n<dd>November, 2011<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg15.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. S (3.84kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Okinawa City<\/dd>\n<dt>Installation<\/dt>\n<dd>May, 2012<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg16.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. T (6.90kW )<\/dd>\n<dt>Job<\/dt>\n<dd>Uruma City<\/dd>\n<dt>Installation<\/dt>\n<dd>May, 2012<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg17.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. S (4.14kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Motobu Town<\/dd>\n<dt>Installation<\/dt>\n<dd>May, 2012<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg18.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. M (4.14kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Urasoe City<\/dd>\n<dt>Installation<\/dt>\n<dd>February, 2010<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box --><\/p>\n<div class=\"box\">\n<img decoding=\"async\" src=\"\/images\/business\/simg19.jpg\" alt=\"\"><\/p>\n<dl>\n<dt>Customer<\/dt>\n<dd>Mr. &amp; Mrs. N (3.10kW)<\/dd>\n<dt>Job<\/dt>\n<dd>Yaese Town<\/dd>\n<dt>Installation<\/dt>\n<dd>May, 2013<\/dd>\n<\/dl>\n<\/div>\n<p><!-- box -->\n<\/div>\n<p><!-- list -->\n<\/div>\n<\/div>\n<p><!-- solen --><\/p>\n<div class=\"box_results\">\n<img decoding=\"async\" src=\"\/images\/business\/results.jpg\" alt=\"\">\n<div class=\"txt\">\n<h4>Installation Results<\/h4>\n<a href=\"\/en\/results\">Our track at a glance<\/a>\n<\/div><!-- txt -->\n<\/div><!-- box_results -->\n<\/div>\n<p><!-- inner --><\/p>\n<p><div class=\"businav\">\n<h3>Business Outline<\/h3>\n<ul>\n<li><a href=\"\/en\/business\/electrical\"><span>Electrical Instrumentation<br>Equipment Installation<\/span><\/a><\/li>\n<li><a href=\"\/en\/business\/maintenance\"><span>Maintenance<br>and<br>Inspection<\/span><\/a><\/li>\n<li><a href=\"\/en\/business\/solarpower\"><span>Solar Power<\/span><\/a><\/li>\n<li><a href=\"\/en\/business\/product\"><span>Sales of Goods<\/span><\/a><\/li>\n<\/ul>\n<\/div><!-- businav --><br \/>\n<div class=\"fcontact\">\n<div class=\"inner\">\n<div class=\"box box1\">\n<img decoding=\"async\" src=\"\/images\/common\/icn_company.png\" alt=\"\">\n<h2>Company overview<\/h2>\n<a href=\"\/en\/company\"><\/a>\n<\/div><!-- box -->\n\n<div class=\"box box2\">\n<p class=\"phone\">Tel.<b>098-878-6385<\/b><\/p>\n<p>hours\u30008:30 - 17:30<\/p>\n<a href=\"\/en\/contact\">Contact Details<\/a>\n<\/div><!-- box -->\n<\/div><!-- inner -->\n<\/div><!-- fcontact --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>About Solar Panels Solar power construction results Solar power Solar Cell Manufacturers We Represent Kaneka,  [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":164,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-172","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/pages\/172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/comments?post=172"}],"version-history":[{"count":0,"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/pages\/172\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/pages\/164"}],"wp:attachment":[{"href":"https:\/\/okinawakobori.com\/en\/wp-json\/wp\/v2\/media?parent=172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}